A wind farm can be ready to make electricity and still be told to make less. That’s called curtailment. One reason is a limit on the transmission lines carrying power out of the area. If those lines are already full, more wind at one farm doesn’t give the electricity another route.
What if the lines have plenty of room?
Other limits can matter too. The grid may already have plenty of generation and too little demand at that moment. An operator can ask some generators to reduce output while keeping enough of the right equipment running for reliability.
Is this the same as shutting down in very strong wind?
A turbine can stop on its own to protect its equipment in high wind. Curtailment can happen when the weather is fine for generating. The limit comes from how much power the farm can put onto the grid at that time.
For more on how the grid uses power from different kinds of generators, see Basics of Electric Utilities 101.